Commercial · Barge (Vee)
Plan around your load and route.
Work through cargo, crew and running conditions with the Hanko team.
Start with your requirements
Define the job.
Then work through the build.
A series name is the starting point. Equipment, operating conditions and access requirements determine the details of your boat.
Bring these details
- Your route and water conditions
- Working loads, crew and equipment
- Deck layout and access needs
- Transport, storage and power preferences
